Clearing, Grading & Temporary Erosion Control
Standard Detail
Section 5
Revision Date Redmond
Standard Plan
WSDOT Standard Plan
       
Filter Fabric Fence 03/01/11 502  
Stabilized Construction Entrance 03/01/11 503  
Paved Construction Exit 03/01/11 503A  
Temporary Swale 03/01/11 504  
Earth Dike 03/01/11 505  
Perimeter & Dike/Swale 03/01/11 506
Storm Drain Inlet Protection 06/30/07   I-7
High Visibility Fence 08/11/09   I-15