134th Ave Sidewalk Improvements

Location: 134th Ave. NE from NE 75th St. to NE 80th St.

Project Phase: Construction

Estimated Timeline: Construction is expected to be completed by the end of August 2018

Project Manager: Bassam Al-Ali, 425-556-2743

Page Last Updated: 08/09/18

Construction is 90% complete, with flashing beacon installation scheduled to occur before the start of school.

Description:
As part of the Safe Routes to School program, the City of Redmond is constructing a complete sidewalk on the east side of 134th Ave NE from NE 75th St. to NE 80th St. The project includes sidewalk, lighting and a flashing beacon pedestrian crossing at NE 80th St.

134th Ave Sidewalk Project Location Map