OVERLAKE:

North Infiltration Vault
Park bench

Location:  Most likely on the block bounded by 151st, 152nd, 26th and 27th
Project Phase:  Planning
Timeline:  2020s-2030
Contact: Steve Hitch, Senior Stormwater Engineer, 425-556-2891

The North Infiltration Vault is the third of three regional stormwater facilities proposed for Overlake Village. This large facility will complete the retrofit of the Overlake basin to current stormwater runoff treatment and flow control standards.

This vault will be constructed as redevelopment occurs in the future, probably in the late 2020s. A two-acre park, North Village Park, will be constructed on top of the stormwater vault, surrounded by new Overlake Village Street Grid.