2018 Pavement Repairs

Vicinity Map

Location: Various locations - see vicinity map

Project Phase: Pre-Construction

Estimated Timeline: Construction is expected to begin in May 2018 with completion in August 2018

Contact: John Mork, 425-556-2713

Page Last Updated: 04/02/18

Description:
Test alternative pavement methods to extend the life of the City’s asphalt paved roadways. Repair asphalt in bike lane areas and where City water line breaks have occurred.
  • Crack seal the pavement to reduce the amount of water infiltrating the subgrade on NE 116th Ave between 160th Ave NE and 163rd Ave NE
  • Repair damaged asphalt:
  • Avondale Road at NE 85th Street
  • Avondale Road at NE 88th Street
  • Avondale Road at NE 90th Street
  • 153rd Ave NE and NE 71st Street
  • Redmond Way between West Lake Sammamish Parkway and the bridge abutment (includes rechannelization to add shoulders to edge of Redmond Way)
  • Install a concrete bus pad on 148th Ave NE adjacent to the Rapid Ride bus stop near NE 87th St
  • Preserve the existing asphalt by adding a slurry seal coating:
  • 184th Ave NE from the cul de sac to NE 24th Street
  • 186th Ave NE from NE 21st to NE 24th Street   
  • Rechannelize the roadway on 150th Avenue NE from NE 40th Street to NE 51st Street to add additional bicycle lane segments as well as a northbound right turn lane at NE 51st Street
  • Trench patch on NE 28th between 180th Ave NE and the cul-de-sac