148th Ave NE & NE 51st St Pavement Repairs

Vicinity Map

Location: See vicinity map 

Project Phase: Design

Estimated Timeline: Construction is expected to begin in Spring 2017 and be completed by late 2017

Project Manager: Eric Dawson, 425-556-2723

Page Last Updated: 02/22/17

Description:

This project will prolong the pavement life on:

  • 148th Ave NE from the SR 520 Bridge to NE 36th Street
  • NE 51st Street from 148th Ave NE to 156th Ave NE

Both the 148th Ave NE Pavement Preservation project and the NE 51st Street Pavement Preservation project are federally funded. Each project will rehabilitate approximately half-a-mile of deteriorating pavement. Construction on both roadways includes:

  • Grinding and resurfacing the roadway curb to curb with hot mix asphalt   
  • Constructing curb ramps to current ADA standards  
  • Signal loop replacements

The NE 51st Street project also includes:

  • Repairing fatigued pavement areas
  • Lane rechannelization
  • Replacing damaged and deteriorated storm water pipes
  • Upgrading sanitary sewer manhole lids